Send Message
Home News

company news about How much biogas/methane can be produced from the residual material after fermentation?  

Certification
China Shanghai BGO Industries Ltd. certification
China Shanghai BGO Industries Ltd. certification
Customer Reviews
Professional manufacturer, good service, and competitive price. We would like to establish business relationship with BGO.

—— Mike Douglas

Fast delivery, high quality, with low price. Amazing....... Expecting next cooperation.

—— Danish Duncan

I personally dealt with BGO before, good quality and fast delivery. New buyers can trust them, and go ahead do business with BGO.

—— Mohammed Abdul

I'm Online Chat Now
Company News
How much biogas/methane can be produced from the residual material after fermentation?  
Latest company news about How much biogas/methane can be produced from the residual material after fermentation?  

 

In Southeast Asia, Africa, and the Middle East, especially in the Philippines, Thailand, Malaysia, Vietnam, Indonesia, Saudi Arabia, UAE and other countries,  more and more users now choose to use biogas for cooking and power generation; it is environmentally friendly and cost-saving.

 

 

 

Biodegradable materials:

 

such as Plant waste,kitchen waste, human and animal wastes,etc.

 

latest company news about How much biogas/methane can be produced from the residual material after fermentation?    0

 

 

 

latest company news about How much biogas/methane can be produced from the residual material after fermentation?    1

 

 

1)Product name:Slurry Tank

2)Capacity:2000 tons  or as order
3)Size:20M(L)*20M(W)*5M(H)
4)Color:Army Green or Red
5)Material: 1.0mm pvc coated tarpaulin
6)Outlet:plastic, 4"(DN110MM)1PC 7) In1et Valve:Plastic 4"(DN80MM) 1PC

 

 

Process flow chart:

 

 

The operation process is as follows:
1) Put organic matters into the first slurry bag completely for 20 days. Seal up when it's full, and then put into next slurry bag.
2) Put 100 tons of organic matter (the first slurry bag) every day, and the total amount will reach 2000 tons after 20 days. At this time, 400 tons (400 CBM) of gas can be produced per day.
3) After 15 days of fermentation, biogas can be produced. Per ton of raw materials can produce 0.2 CBM biogas.
4) About 40 days, clean the remaining garbage; time also according to the usage of the other two slurry bags.

5)
We design 5M height of Slurry Tank,will have biogas on the top and fermentation on the bottom.There is no need a biogas bag, which can reduce space and save costs.


 

 

 

 

latest company news about How much biogas/methane can be produced from the residual material after fermentation?    2

 

Biogas desulfurizer:

diameter 300mm, height 800mm, carbon steel anticorrosion (inner wall 1mm thick epoxy resin), plate thickness 4mm, containing desulfurizer (iron oxide), supporting accessories: 1 stainless steel ball valve, 2 flanges, blind 2 plates.

 

Our company can provide a complete design plan for biogas fermentation, production, purification, and power generation. Welcome to inquire and look forward to long-term cooperation.

 

Pub Time : 2021-08-17 14:19:56 >> News list
Contact Details
Shanghai BGO Industries Ltd.

Contact Person: Mrs. Virginia

Tel: +8618012683155

Fax: 86-512-57603312

Send your inquiry directly to us (0 / 3000)